Benefits of Project
The project is now the primary power source for the institution generating 60% of the power utilized by the hospital. ZESA is now supplementing the solar and a small 60kva generator was connected to the system to account for rainy days. As a result, power outages are no longer threatening patient welfare, and the cost of running a diesel generator as backup has been significantly reduced by almost 95%. Ultimately, the monthly utility bill has also reduced by more than 50% providing a very good return on investment
Technologies What We Used
- Victron Quattro 10kVa Inverters
- Victron Multisolar Charge Controllers
- Victron Cerbo GX and VDU
- Fronius Eco 27 Inverters
- 60/40 Freedom Won Batteries
- 555w Jinko All weather panels